Waverley West Elementary and High Schools, Winnipeg, MB.

“The design is guided by the principles of liveability, sustainability, durability and flexibility and creates a facility that supports: physical and psychological health of students and staff; occupant health, systems and energy efficiency and responsible use of materials; life-cycle considerations of operations and maintenance; and flexibility to adapt to the continued evolution of the Waverley …

Harvey Redsky Memorial K-8 School – Shoal Lake #40 First Nation, ON.

Client: Shoal Lake #40 First Nation Architects: Prairie Architects Inc. Consultants: Wolfrom Engineering, KGS Group (M+E), JR Cousin (Cost), Scatliff Miller Murray (Landscape) General Contractor: Parkwest Projects Ltd. Completion: 2021 ” A key design factor early in the design process was that the new 18,200 sf facility should equal more than the sum of its …

Amber Trails School – Winnipeg, MB.

Client: Public Schools Finance Board Seven, Seven Oaks School Division Architects: Prairie Architects Inc. Consultants: Wolfrom Eng. Ltd (Structural), Enermodal Eng. Ltd. (M+E), HTFC (Landscape), Integrated Designs Inc. (Costing) General Contractor: Bockstael Construction Ltd. Completed: 2015 In a time when the spotlight has shone on Manitoba in the news, can we dream of children whose …