Waverley West Elementary and High Schools, Winnipeg, MB.

“The design is guided by the principles of liveability, sustainability, durability and flexibility and creates a facility that supports: physical and psychological health of students and staff; occupant health, systems and energy efficiency and responsible use of materials; life-cycle considerations of operations and maintenance; and flexibility to adapt to the continued evolution of the Waverley …

RBC Convention Centre – Winnipeg, MB.

Client: RBC Convention Centre Architects: LM Architectural Group, Number TEN Architectural Group Consultants: various General Contractors:  Stuart Olson Construction Completion: 2016 Sustainability LEED Silver Certification was based on site development, water efficiency, energy efficiency, material selection, indoor quality and design innovation. BOMA Best was based on computer system monitoring, energy efficient light fixtures, automation of …

École Waterford Springs School – Winnipeg, MB.

Client: Winnipeg School Division Architects: LM Architectural Group Consultants: Crosier Kilgour and Partners (Structural), Epp Siepman Engineering (M+E), HTFC (Landscape) and Sison Blackburn (Civil), Province of Manitoba General Contractors: Bockstael Construction Completion: 2021 The name of the school ” represents growth and connection to nature and the indigenous aspects being incorporated into the school” – …

Bill and Helen Norrie Library, Winnipeg, MB.

Client: City of Winnipeg Architects: LM Architectural Group Consultants: ESP Interior Design Services, Tower Engineering (S, M+E), HTFC (Landscape), Sison Blackburn, Moor Transportation General Contractor: unknown Completion: 2021 “Inspired by Rooster Town History and local residential context in which typical home typologies were monoslope or Gable roof in form the new Bill and Helen Norrie …