Amber Trails School – Winnipeg, MB.

Client: Public Schools Finance Board Seven, Seven Oaks School Division

Architects: Prairie Architects Inc.

Consultants: Wolfrom Eng. Ltd (Structural), Enermodal Eng. Ltd. (M+E), HTFC (Landscape), Integrated Designs Inc. (Costing)

General Contractor: Bockstael Construction Ltd.

Completed: 2015

In a time when the spotlight has shone on Manitoba in the news, can we dream of children whose hearts and minds truly understand and embrace difference and grow up to seeing our diversity is our greatest strength rather than a deficit.

In a time when society encourages “what do I get?” thinking, will our children be able to recognize their own privilege and ask “what can I give?” instead, to build a more equitable society?

This is the dream, the hope, the path we journey on with children at Amber Trails.  An education that grows goodness in our children.

 – Ms. Lorelei Bunkowsky, Former Principal of Amber Trails Community School

Sustainability

LEED platinum, energy use reduction, water reduction, future proofing strategy, ventilation, air quality testing, natural light, large glass walls to improve transparency, efficient lighting fixtures and reduced light pollution.

Inclusive indoor and outdoor environments, cultural gathering spaces, community gymnasium, kitchen and public library, daycare, early learning centre, wall and floor assembly programming, seniors connectivity, vegetable farm, accessible walking trails, health and well being.

Learn More/Get Involved

Prairie Architects

HTFC

Bockstael Construction

Wolfrom Engineering